Search :
 

Click Here to see latest information about Tender Notices and related information, thank you.

KAKINADA DEEP WATER PORT



  • Kakinada Sea Ports Limited is a Special Purpose Company set up in 1999 as a part of its privatization initiatives by the government.
  • It is promoted by Kakinada Infrastructure Moldings Pvt. Ltd., group and Konsortium Logistic Berhad of Malaysia with an objective of developing and operating a truly world class Hub.
  • This deep-water port is located on the east coast of India with a graphical position of

    Located at:-
    • North:- Latitude 17° 05.8’ N and longitude of 82° 31.5’ E.
    • South:- Latitude 16° 55.9’ N and longitude of 82° 30.0’ E.
    • East :- (A) Latitude 17° 05.8’ N and longitude of 82° 31.5’ E.
                  (B) Latitude 17° 00.0’ N and longitude of 82° 31.5’ E.
                  (C) Latitude 16° 55.9’ N and longitude of 82° 30.0’ E.

  • It is situated 170 km south of Visakhapatnam and 650 km north of Chennai. Kakinada forms the main gateway port for the rich agricultural belt of East Godavari, West Godavari and Krishna Districts of Andhra Pradesh.
  • Conservancy powers vested with Kakinada Seaports Company Limited.
  • The port is developed with the land to an extent of Ac.302


THE KEY FEATURES



  • All weather, deep water.
  • It has a channel depth of 12 metres.
  • The berth waiting time is the minimum in the country of 0.31 hours as against 5.0 hours in major port.
  • The vessel turnround time is one day as against 3.5 days in major ports.
  • It has secured warehouses and spacious storage yards.
  • It is blessed with an efficient evacuation corridor and rail/road linkage.
  • It is an ISO and ISPS certified port.


PRESENT STAGE:



  • Commercial operations are commenced from 1-4-1999
  • Berths availability: 4 Berths are in operation
    • Cargo Berth – 910 Mts
    • Multi cargo berth – 635 Mts
    • Offshore supply vessels Berth
    • Coast Guard Berth
    • The 5th and 6th Berths are under construction stage

  • Draft Depth of the channel availability is 14.00 Mts.
  • Vessel handling capacity is 50,000 DWT.
  • Cargo of 10.81 Million Tons was handled during 2010-11.
  • Ship to ship transport facility is available.


Click here to visit Kakinada Deep Water Port